- Consulting of beverage Plant Construction annual capacity 20 million cases ( 1998 -1999)
- Coagulation water system 100m3/h – (2000)
- Supervision Can Line 70.000 cans / hour ( 1999-2000)
- 12 Projects ( manpower line reduction , sustainability , reformulation ) improving productivity – 20 millions in East Europe Plants ( 2000-2010)
- Supervision Can Line installation 40000 cans / hour ( 2017)
- Application of 20 contact packing contacts around Europe (2018-2020 )
- Case Study for the construction of an energy drink factory ( 2021)
We are always dedicated to improve your final product and your production line.